Excellent design and sustainable headquarters MRW

MRW’s corporate headquarters, located in L’Hospitalet de Llobregat (Barcelona), has achieved the first certification BREEAM Spain of its design phase to the  classification of Excellent, the highest achieved to date for an office building in Spain.

 

This is the first time that a project architectural level received in Spain Excellent for this certification and also first certificate issued directly by BREEAM Spain. Certification of the building, obtained now under design, is the first step so that, once the work, the building gets the seal BREEAM ES. The proposed new headquarters of MRW envisages a total constructed area6, 600 m², including parking. The building corporate will have about 5,000 m2office divided into ground floor plus four floors, with open spaces and flexible which employ more than 200 employees. The new building is owned by the Group MRW and the work is being carried out by FCC. Eurocontrol is the Chartered Organization it belongs to the Advisory BREEAM certification ES. The technical team Project consists of Nomen Architects, as editors, Philae Engineering Projects such as Project Management, and K2Consulting, as responsible for the engineering facilities.

 

A sustainable building

In general we can say a BREEAM building has a structure healthy and productive for its occupants and is efficient in the resources it uses. It characterized by fuel
economy in water, energy and materials, offering the Once a high degree of user comfort. Translated into figures, sustainable buildings Reduced maintenance costs:
consumed between 50 and 70%less energy, up to 40% less pending on water and waste management can reduced by 70%. In the case of MRW headquarters, sustainable strategy according to BREEAM has been taken into account during the design phase of the building and will be implemented during the construction phase of the building is summarized in the following: Management: the building will be managed in a respectful and responsible both the environment and to society, including proper management of waste generated by the work efficiency in terms of resource use, consumption energy and air pollution both the dust generated in the work as contamination of ground water at the site.

 

Energy efficiency in relation to efficiency energy and to minimize both energy consumption and CO2 emissions from both the building and of the mobility processes associated with it has sought to prioritizethe energy rating of obtaining building Class A buildings (according to criteria ICAEN of the Generalitat de Catalunya), the envelope telecontrol and consumption meters energy supply of energy sources renewable solar energy, lighting and encourage efficient and lifts to perform the commissioning of the facilities to ensure operation efficient and ensure parking and bicycle facilities, access to transport nearby public (train, bus and metro)recharging electric cars and information campaigns workers to promote sustainable transport, etc. Saving water consumption to achieve a reduced  consumption of water and a responsible resource management will be implemented measures to encourage water saving as devices for efficient healthcare water consumption, the reuse of water rain and gray, the implementation of remote system and counters in all plants facilitate consumption and detection systems leakage
to avoid unnecessary consumption.

 

Reduced environmental impact: to reduce environmental impact in relation to building materials, have been mainly the use of low impact materials environmental
eco-labels have environment and that are recyclable, such as for example, recycled aluminum slats and reeds. Has also performed an analysis lifecycle of the building in order to specify solutions involving a minor environmental impact considering all the life cycle.


Ecology: in relation to ecology, the building is built on ground that was already previously urbanized which avoids the use virgin soil and will promote increased the ecological value of the place with the incorporate landscaped areas and a cover, which provides a great isolation and creates a microclimate for the building, consisting of drainage cells besides allowing the cover to be passable can get to pick up 50l/m2.

 

Benefits for users


The building is designed to ensure comfort of users who work in it. Among other things, enhance lighting natural. The facade will be made by a double skin curtain
wall with an aluminum enclosure and rattan strips acting as a sunscreen, which may be a computer controlled or manually. To allow a healthy internal environment is incorporate materials with low levels of VOCs. Available office space and service areas for employees (cafeteria, fitness, leisure and rest, library, etc ...), parking (underground and surface) and car park bicycles. The parking be prepared to facilitate there charging electric cars and is provided a mobility plan that encourages the use of public transport.

     
2012/09/28 by Gloria Llopis